About tasks tab

Build 1501 on 14/Nov/2017  This topic last edited on: 28/Oct/2016, at 11:48

The Tasks Tab displays all the Tasks available in the GN4 system. A task has a number of properties (defined in the GN4 XML schema), where the most important ones are:

• A task is defined within a parent calendar, from which the task inherits a workstate.

• You can move (send) a task from one calendar to another using a predefined copyflow.

• You can assign a task to a GN4 user (to only one user).

• You can assign to a task one or more products (articles, dummy images).

• A task has a number of date/time related properties, e.g. start date and time, duration, due date, completion date, kind, quantity, position and also percentage of completion, you can use to track down tasks and to manage them precisely.

• You can assign to a task a number of descriptive properties, such as description, who to contact, location, priority, notes, URL, keywords, categories etc.

taskstab

Tasks can be created, copied and edited from this tab. Article product content items (such as text and images) can be attached/uploaded to a task.

The Tasks Tab window is split into 5 Panes and has a Calendar Tree Pane, a Task Grid View, a Task Item Preview, a Task Product Grid View and a Task Product Preview.

The Calendar Tree Pane (left) displays the list of Calendars available in the system:

calendartree2

The Task Grid View Pane (top centre) lists the tasks available that are associated to the selected Calendar:

taskgridviewpane

The Task Grid Preview Pane (top right) shows a preview of the selection in the Task Grid View Pane:

taskgridpreviewpane

The Task Product Grid View Pane (bottom centre) displays the products associated to the selected task in the Task Grid View Pane (top centre):

taskproductgridviewpane

The Task Product Preview Pane (bottom right) previews the Task Product selected in the Task Product Grid View Pane (bottom centre):

taskproductpreviewpane